Measurement
- Version 1 of 1
Measurement Data Component
Title: Monitored rainfall data at Burracott, Neet catchment
Related Party - Individual (Point of Contact): Professor Adie Collins* (Rothamsted Research)
Related Party - Organisation (Funder): Defra
Abstract:
Quality assured high resolution (15 minutes interval) rainfall data for Neet at Burracott.
Subject Keywords: Rainfall; Monitoring
Geographic Keywords: Tamar catchment
Observed Properties: Date; Rainfall; Time
Parameter: Date of measurement
Parameter: Rain (mm)
Parameter: Time of measurement
Geographic Extent - Longitude (West): -4.569339 Longitude (East): -4.51133 Latitude (South): 50.718968 Latitude (North): 50.779404 |
Phenomenon Time - Start Date/Time: 2011-10-01 End Date/Time: 2014-05-28
Result Time: 2014-05-28
Valid Time - Start Date/Time: 2011-10-01 End Date/Time: 2014-05-28
Feature of Interest: hydrosphere
Protocol: Quality assurance and quality control protocols adopted by Hampshire Avon DTC consortium
Publication Date: 2016-05-09
This data is made available under the terms of the FBA Licence.
Total file downloads: 48
Is Input Of | Is Part Of Dataset |
---|---|