Skip to main content

PDF


Title: Addendum to the Stanmoor bank feasibility study and appraisal report : Lower Tone flood defence improvements : phase II
Author: Environment Agency
Document Type: Monograph
Annotation: EA additional title info: G7655
Abstract:
In May 1998, the Stanmoor Bank Feasibility Study and Appraisal Report was issued to statutory consultees for comment. The Environment Agency in considering a range of flood defence options, identified the preferred option as On-line Defence Works, with Crest Level Option A (a maximum crest level raising of 0.08m over a 130m length of the bank). This option and crest level was perceived to provide security against breach and maintained a I in 85 year minimum standard of protection against overtopping. It was proved to be viable on engineering grounds and it was the preferred option on economic and environmental grounds. Since the Feasibility Study and Appraisal Report (May 1998) the Agency have progressed with outline design and there have been some minor changes to the scheme and the design of the preferred option (as described in Section 3.0). The aim of this Addendum is therefore to inform consultees of these alterations and to identify associated temporary and permanent environmental impacts.
Publisher: Environment Agency
Publication Date: 2000
Publication Place: Peterborough
Subject Keywords: Feasibility studiesFlood controlRiversFlood defence structuresEnvironmental impact
Geographic Keywords: EA South WestTone (Somerset)SomersetParrett
Extent: 22; + figures
Permalink: http://www.environmentdata.org/archive/ealit:231
Total file downloads: 382

Download PDF    Display PDF in separate tab