Skip to main content

PDF


Title: Gipping/Stour catchment management plan : consultation report
Author: National Rivers Authority Anglian Region
Document Type: Monograph
Abstract:
This draft catchment plan consolidates the policies, objectives and options for the Gipping/Stour catchment for the overall improvement of the water environment. It must be emphasised that the Catchment Management Plan is not an end in itself. Its aim is to provide a comprehensive guide to the present status and future of the Catchment. It is the essential first step in providing the basis for drawing up a plan of action. The timetable for the planning process is given in Table 1 below. The plan is drawn up as follows: use of the catchment; catchment targets; current shortfalls of the catchment; issues and options. The Plan at this stage was released for public consultation in draft form. Comments on the objectives/targets and Issues/Options are invited before the plan is finalised to produce an Action Plan for the Catchment.
Publisher: National Rivers Authority
Publication Date: 1993
Publication Place: Peterborough
Subject Keywords: Catchment Management PlansAction plansNature conservationRivers
Geographic Keywords: Gipping (Suffolk)East Suffolk catchmentSuffolkStour (Suffolk)
Extent: 99; + appendices
Permalink: http://www.environmentdata.org/archive/ealit:3719
Total file downloads: 308

Download PDF    Display PDF in separate tab