Title: Investigation into the frequency of storm overflow operation at Bradworthy sewage treatment works (1996)
Author: N. Hicks
Document Type: Monograph
Annotation: EA additional title info: Devon Area internal report November 1996
Abstract:
Bradworthy S.T.W. N.G.R. SS 329 135, is a small treatment works with a numeric consent utilising a biological filter system, the final effluent discharges into the River Waldon. However heavy rainfall may cause untreated effluent from the storm settlement tanks to discharge into the river via a screening process. The Devon Area Investigation Team were requested by the Devon Area Water Quality Team to investigate how frequently the storm sewer overflow operated. The data was to be collected and passed on to the Devon Area Water Quality Officer responsible for the Bradworthy catchment.
Publisher: Environment Agency
Publication Date: 1996
Publication Place: Exeter
Subject Keywords: Sewage; Sewage treatment; Effluents; Water quality; Rainfall; Flow rate; Water monitoring
Geographic Keywords: Bradworthy; Waldon (Devon); North Devon catchment
Extent: n.p. [16]
Permalink: http://www.environmentdata.org/archive/ealit:559
Total file downloads: 321
Download PDF Display PDF in separate tab