DevonDefinition N/A Preferred Units: N/A Scope Note: N/A
Geographical Feature | Is Geographical Feature of |
---|
Tavy
| N/A |
This term is used for the following terms: Devonshire
Approved Date 28-Oct-2013 Items having a keyword relationship to this geographic term - 1990 classification of estuary quality
- 1993 general quality assessment (GQA) Cornwall area
- 1997 general quality assessment (GQA) and river ecosystem (RE) non-compliance : Devon area
- 1998 Annual Hydrometric Report
- A collation of the environmental impact work carried out following the Rosebay oil spill, May 1990
- A study to investigate and propose remedies for river quality problems in the Madford catchment
- Agricultural Greenhouse Gas Inventory Research Platform - InveN2Ory. Dung and urine experimental site in Devon, 2012
- Agricultural Greenhouse Gas Inventory Research Platform - InveN2Ory. Fertiliser experimental site in Devon, 2013
- Agricultural Greenhouse Gas Inventory Research Platform - InveN2Ory. Manure experimental site in Devon, 2011-12
- An assessment of water quality in the River Yarty catchment
- An investigation into ammonia levels in Weston Mill Lake, Devonport
- An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
- An investigation into the incidence of spurting from weeping wall slurry stores
- An investigation into the water quality of the River Waldon during wet weather
- An investigation to determine if Deep Moor Landfill Site is causing an impact downstream in the Peagham Stream
- An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
- An investigation to determine possible causes of poor water quality downstream of Chagford STW (WSTW6046B)
- An investigation to find out why Holcombe Beach failed to comply with EC Bathing Waters Directive
- Annual classification of river water quality 1990
- Annual classification of river water quality 1991
- Annual N2O measurements and associated data: AC0101, Devon, 2007
- Annual N2O measurements and associated data: AC0101, Devon, 2008
- Annual N2O measurements and associated data: AC0111, Devon, 2008-2009
- Annual N2O measurements and associated data: AC0111, Devon, 2010
- Annual N2O measurements and associated data: AC0111, Devon, 2010-2011
- Annual N2O measurements and associated data: AC0116, Devon, 2011-2012
- Annual N2O measurements and associated data: AC0116, Devon, 2012, urine
- Annual N2O measurements and associated data: AC0116, Devon, 2013
- Annual N2O measurements and associated data: AC0213, Devon, 2010
- Annual N2O measurements and associated data: AC0213, Devon, 2010-2011
- Annual N2O measurements and associated data: AC0213, Devon, 2011
- Annual N2O measurements and associated data: AC0213, Devon, 2012
- Annual N2O measurements and associated data: NT26, Devon, 2004
- Annual N2O measurements and associated data: SLURRY-NR, Devon, 2004
- Appledore tidal defence scheme
- Artificial recharge to groundwater in the Otter valley
- Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
- Assessment of the impact of discharges from Meldon Quarry on the water quality of the West Okement River
- Atmospheric inputs of pollutants to surface waters
- Avon and Erme : action plan : December 1998
- Avon and Erme : first annual review : February 2000
- Avon and Erme : second annual review
- Avon and Erme : third annual review
- Axe and Lim : action plan
- Axe and Lim : annual review : March 2002
- Axe and Lim : consultation draft : December 1999
- Axe and Lim catchment management plan : second annual review 1999
- Background soil mineral nitrogen contents: AC0213, Devon, 2010-11
- Background soil mineral nitrogen contents: AC0213, Devon, 2012
- Background soil mineral nitrogen: AC0101, Devon, 2007
- Background soil mineral nitrogen: AC0101, Devon, 2008
- Background soil mineral nitrogen: AC0213, Devon, 2010
- Background soil mineral nitrogen: AC0213, Devon, 2011
- Bathing water trials 2000 season
- Biological assessment of the effects of Ivybridge Sewage Treatment Works on the River Erme
- Biological investigation of the Common Lake Stream
- Biological study of Upper Tamar Lake 1997 : final report
- Classification of estuary quality
- Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
- Daily N2O: AC0213, Devon, 2010-2011
- Daily nitrous oxide (N2O) flux measurements: AC0101, Devon, 2007
- Daily nitrous oxide (N2O) flux measurements: AC0101, Devon, 2008
- Daily nitrous oxide (N2O) flux measurements: AC0213, Devon, 2010
- Daily nitrous oxide (N2O) flux measurements: AC0213, Devon, 2011
- Daily nitrous oxide (N2O) flux measurements: NT26, Devon, 2004
- Daily nitrous oxide flux measurements: AC0111, Devon, 2008-2009
- Daily nitrous oxide flux measurements: AC0111, Devon, 2010
- Daily nitrous oxide flux measurements: AC0111, Devon, 2010-2011
- Daily nitrous oxide flux measurements: AC0116, Devon, 2011-2012
- Daily nitrous oxide flux measurements: AC0116, Devon, 2012, urine
- Daily nitrous oxide flux measurements: AC0116, Devon, 2013
- Daily nitrous oxide flux measurements: AC0213, Devon, 2012
- Daily nitrous oxide flux measurements: SLURRY-NR, Devon, 2004
- Daily topsoil mineral nitrogen: AC0116, Devon, 2011-2012
- Daily topsoil mineral nitrogen: AC0116, Devon, 2012, urine
- Daily topsoil mineral nitrogen: AC0116, Devon, 2013
- Daily topsoil mineral nitrogen: AC0213, Devon, 2010
- Daily topsoil mineral nitrogen: AC0213, Devon, 2010-2011
- Daily topsoil mineral nitrogen: AC0213, Devon, 2011
- Daily topsoil mineral nitrogen: AC0213, Devon, 2012
- Daily topsoil mineral nitrogen: NT26, Devon, 2004
- Daily topsoil mineral nitrogen: SLURRY-NR, Devon, 2004
- Devon area industrial and commercial waste minimisation and recycling directory
- Devon area internal report - further investigations into pipe discharges in the Lower Teign estuary
- Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
- Devon area internal report - portilly outfall - Camel Estuary bathymetric survey
- Devon area internal report - the kingsbridge estuary - survey of the benthic microinvertebrate infauna (october 1990) for the proposed classification of estuaries in the south western region
- Devon area report - River Creedy fisheries survey 1994
- Dung and urine application dates: AC0116, Devon, 2012, urine
- East Devon public water supply strategy : Exe freshwater model - QUASAR validation/calibration
- East Devon public water supply strategy : Exe freshwater model Wimbleball pump storage scheme scenario modelling
- East Devon public water supply strategy : surface water yield assessment - use of generated long flow records
- East Devon public water supply strategy : the existence and potential use in yield analysis of historic flow records
- East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
- Efficacy and environmental effects of peracetic acid as a sewage disinfectant (231/6/SW)
- Environmental planning issues in the North Wessex area
- Exe : action plan : plan from July 2000 to July 2005
- Exe : consultation draft : July 1999
- Exe : first annual review
- Exe : summary of public consultation responses : July 1999 - October 1999
- Exe freshwater model : quasar model design
- Exeter flood defence scheme
- Experimental determination of nitrous oxide emission factors for arable land. Experimental site in Devon, 2007
- Experimental determination of nitrous oxide emission factors for arable land. Experimental site in Devon, 2008
- Fertiliser application dates: AC0101, Devon, 2007
- Fertiliser application dates: AC0101, Devon, 2008
- Fertiliser application dates: AC0116, Devon, 2013
- Fertiliser application dates: AC0213, Devon, 2010
- Fertiliser application dates: AC0213, Devon, 2011
- Fertiliser application dates: NT26, Devon, 2004
- First annual review of the River Exe catchment management plan
- First annual review of the River Taw catchment management plan (1996)
- First annual review of the Taw/Torridge estuary catchment management plan (1996)
- Fisheries technical report : Devon area report : River Taw fisheries survey 1996
- Fisheries technical report : Devon area report. River Avon fisheries survey
- Freshwater Tamar and tributaries catchment management plan : action plan
- Further Validation of PHABSIM for the Habitat Requirements of Salmonid Fish
- General Quality Assessment (GQA) Devon Area 1994
- Hartland and Clovelly streams : catchment action plan
- Hartland streams river water quality classification 1991
- Health effects of sea bathing (EH 9021). Phase 3 studies in 1991 : interim report April 1991 to March 1992 (Interim)
- Help safeguard the Torridge (leaflet)
- Identification of pollution incidents potentially affecting routine monitoring sites 1991-1992 : draft report
- Identified uses of tidal waters : volume 1
- Identified uses of tidal waters : volume 2
- Impact assessment of acidic and metalliferous pollution in the Fowley Stream
- Impact of sediment regime on salmonids
- Integrated Strategies to Minimise Slurry Nitrogen Losses – Application Rates and Method. Experimental site Devon, 2004
- Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)
- Investigation into potential inputs to Combe Stream, South Devon (1998)
- Investigation into potential storm sewage discharge movements during spring and neap tides from Sharkham Point storm overflow
- Investigation into storm discharges at Ipplepen Sewage Treatment Works
- Investigation into the cause of high pH in the Budleigh Brook
- Investigation into the chemicals present and entering the Stover Lake, Stover Country Park
- Investigation into the storm overflow discharge regime of Hill Barton Seawage Treatment Works Okehampton
- Investigation of final effluent flow at Fluxton STW
- Investigation of the environmental impact of Coombe Farm on the Clapton Stream January 1992
- Investigation of the impact on water quality of the SWW Teign estuary sewerage trenching activity
- Investigation of the water quality in the Buckland stream up and downstream of East/West Buckland
- Investigations into the contribution of Marlborough STW to the non-compliance of Salcombe South Sands with the EC bathing waters directive
- Links : an overview of the work of the Environment Agency in Devon : autumn/winter 2003
- Malodours and discolouration on the Wool Brook Sidmouth
- Managing flood risk river Tamar October 2006
- Manure application dates: AC0111, Devon, 2008-2009
- Manure application dates: AC0111, Devon, 2010
- Manure application dates: AC0111, Devon, 2010-2011
- Manure application dates: AC0116, Devon, 2011-2012
- Manure application dates: AC0213, Devon, 2010-2011
- Manure application dates: SLURRY-NR, Devon, 2004
- Monitoring of tidal water for EC dangerous substances list I and II, 1990
- National marine baseline survey 1995 : littoral cell 6 : Portland Bill to Lands End
- National marine baseline survey 1995 : littoral cell 7 : Lands End to the Severn Estuary
- Nitrification inhibitors and fertiliser nitrogen application timing strategies to reduce N2O. Site in Devon, 2010
- Nitrification inhibitors and fertiliser nitrogen application timing strategies to reduce N2O. Site in Devon, 2011
- Nitrification inhibitors and fertiliser nitrogen application timing strategies to reduce N2O. Slurry site in Devon, 2010-11
- Nitrification inhibitors and fertiliser nitrogen application timing strategies to reduce N2O. Urine site in Devon, 2012
- Nitrous Oxide and Ammonia Emissions from Multiple Pollutant Cracking Clay Experimental Sites. Devon, 2008-09
- Nitrous Oxide and Ammonia Emissions from Multiple Pollutant Cracking Clay Experimental Sites. Devon, 2010
- Nitrous Oxide and Ammonia Emissions from Multiple Pollutant Cracking Clay Experimental Sites. Devon, 2010-11
- Non-compliance of the Bidwell Brook with river quality objectives
- Non-compliance with water quality objectives on the Croyde stream (upper catchment)
- North Devon coast and Lyn catchment river water quality classification 1990
- North Devon coast and Lyn catchment river water quality classification 1991
- North Devon coastal streams : catchment action plan
- North Devon streams : action plan, August 1997
- North Devon streams : consultation report, October 1996
- North Devon streams : first annual review, October 1998
- North Devon streams : second annual review : October 1999
- North Devon streams : third annual review, April 2001
- North Wessex Area : tide table 2001 : : Ilfracombe, Porlock Bay, Minehead, Hinkley Point, Bridgwater, Burnham-on-Sea, Weston-super-Mare, Clevedon, Avonmouth, Cumberland Basin Entrance
- North Wessex area tide table 2004 : Ilfracombe, Porlock Bay, Minehead, Hinkley Point, Bridgwater, Burnham-on-Sea, Weston-super-Mare, Clevedon, Avonmouth, Bristol (Cumberland Basin Entrance)
- Occurrence of cryptosporidium oocysts in river water
- Organo-chlorine pesticide residues in freshwater fish [eels]
- Preventing the spread of crayfish plague in the South West
- Protection through partnership : Devon area
- Protection through partnership : North Wessex area
- Public water supplies in the NRA - Wessex Region : initial report 1990
- Quality audit of biological samples for the 1991 river quality survey
- Regional water quality monitoring and surveillance programme for 1992 : consent compliance assessment of effluent discharges
- Regional water quality monitoring and surveillance programme for 1992 : quality assessment of enclosed waters by G. Hawley
- Regional water quality monitoring and surveillance programme for 1992 : quality investigations in controlled waters
- Regional water quality monitoring and surveillance programme for 1992 : tidal waters monitoring and surveillance
- Regional water quality monitoring and surveillance programme for 1993 : quality investigations in controlled waters : final draft report
- Regional water quality monitoring and surveillance programme for 1993 : tidal waters monitoring and surveillance : final draft report
- Regional water quality monitoring and surveillance programme for 1994 : EC surface water abstraction directive : final draft report (1993)
- Report on the management of the drainage regime within Exminster Marshes
- Report on the survey of SBM handlers in Devon
- Review of environmental statement Rive Axe option : implications for water quality
- Review of fishery regulations on the Rivers Taw and Torridge
- River Avon : catchment action plan
- River Avon catchment river water quality classification 1990
- River Avon fisheries survey 1994
- River Axe : catchment action plan
- River Axe catchment river water quality classification 1990
- River Axe catchment river water quality classification 1991
- River Axe fisheries survey 1994
- River Bovey and Bovey minor tributaries corridor survey : October-November 1990 : a report prepared for the National Rivers Authority (South West Region)
- River Clyst fisheries survey 1994
- River Culm fisheries survey 1994
- River Dart : action plan
- River Dart : catchment action plan
- River Dart : consultation report
- River Dart catchment river water quality classification 1990
- River Dart catchment river water quality classification 1991
- River Dart net limitation order review
- River Dart salmon spawning target and compliance assessment
- River Erme : catchment action plan
- River Erme catchment river water quality classification 1990
- River Erme catchment river water quality classification 1991
- River Erme fisheries survey 1994
- River Exe : catchment action plan
- River Exe Action Plan August 1996
- River Exe catchment management plan : action plan (1996)
- River Exe catchment management plan : consultation report
- River Exe catchment river water quality classification 1990
- River Exe catchment river water quality classification 1991
- River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region)
- River Lyn fisheries survey 1994
- River Meavy salmon and sea trout populations : assessment of the impact of flows
- River Otter : catchment action plan
- River Otter : environmental data review. Volume 1 : summary : River Otter environmental study 1993/94
- River Otter : environmental data review. Volume 2 : text : River Otter environmental study 1993/94
- River Otter : environmental data review. Volume 3 : figures and tables : River Otter environmental study 1993/94
- River Otter : environmental data review. Volume 4 : appendices : River Otter environmental study 1993/94
- River Otter catchment river water quality classification 1990
- River Otter catchment river water quality classification 1991
- River Otter low flow study : phase three report
- River Plym : catchment action plan
- River Plym catchment river water quality classification 1990
- River Plym catchment river water quality classification 1991
- River quality classification 1985-1989
- River quality classification 1985-1990 : identification of possible causes of non-compliance with river quality objectives
- River Sid : catchment action plan
- River Sid catchment : river water quality classification 1990
- River Sid catchment : river water quality classification 1991
- River Tamar (not Tavy and Lynher) : catchment action plan
- River Tavy catchment river water quality classification 1990
- River Tavy EC Freshwater Fish Directive failure 1993
- River Taw : catchment action plan
- River Taw : habitat rehabilitation 1992
- River Taw catchment management plan : consultation report
- River Taw catchment management plan : public consulatation
- River Taw catchment river water quality classification 1990
- River Taw catchment river water quality classification 1991
- River Teign : action plan : January 1998
- River Teign : catchment action plan
- River Teign catchment river water quality classification 1990
- River Teign catchment river water quality classification 1991
- River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
- River Teign net limitation order review, September 2002
- River Torridge catchment action plan
- River Torridge catchment management plan : consultation report : May 1993
- River Torridge catchment management plan : consultation report public consultation (leaflet)
- River Torridge catchment management plan : final report
- River Torridge catchment management plan : stage 1 : statement of catchment uses and problem identification
- River Torridge catchment river water quality classification 1990
- River Torridge catchment river water quality classification 1991
- River Torridge Salmon and Sea Trout : Redd distribution 1969-1991
- River Yealm : catchment action plan
- Rivers Avon and Gara catchments river water quality classification 1991
- Rivers Axe and Lim catchment management plan : consultation report
- Rivers Sid and Otter catchment management plan : consultation report
- Roadford operational and environmental study : draft final report : Volume 2 : annex A, hydrology annex B, water quality annex C consultation
- Roadford operational and environmental study : draft final report : Volume 3 : annex D ecology, annex E recreation
- Roadford operational and environmental study : draft final report : Volume 5 : annex G monitoring, annex H reservior operating agreement
- Routine monitoring of river water quality : sampling and analysis schedule
- Second annual review of the River Taw catchment management plan
- Second annual review of the River Torridge catchment management plan
- Second annual review of the Seaton, Looe and Fowey catchment management plan
- Second annual review of the Sid/Otter catchment management plan 1999
- Second annual review of the Taw / Torridge Estuary catchment management plan
- Soil moisture data: AC0101, Devon, 2007
- Soil moisture data: AC0101, Devon, 2008
- Soil moisture data: AC0116, Devon, 2011-2012
- Soil moisture data: AC0116, Devon, 2012, urine
- Soil moisture data: AC0116, Devon, 2013
- Soil moisture data: AC0213, Devon, 2010
- Soil moisture data: AC0213, Devon, 2010-2011
- Soil moisture data: AC0213, Devon, 2011
- Soil moisture data: AC0213, Devon, 2012
- Soil moisture data: NT26, Devon, 2004
- Soil moisture data: SLURRY-NR, Devon, 2004
- South West Region Plan Summary 1991/1992
- Stock assessment review on the River Dart
- Stock assessment review on the River Teign
- Taw/Torridge Estuary Catchment management plan : action plan
- Taw/Torridge Estuary catchment management plan : public consultation
- Taw/Torridge estuary management plan : stage 1 : statement of catchment uses and problem identification
- Teign estuary post scheme appraisal report of 1991 surveys : final draft report
- The disposal of sheep dip waste (R and D Report 11) : effects on water quality
- The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Devon, 2004
- Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997)
- Time of travel of pollutants study : River Taw : Q22/Q25
- Torridge data report : biological monitoring of organic inputs to the study catchments using rapid biological assessment keys
- Two year aesthetic survey of beaches in the South West (1990 and 1991)
- Urban waste water treatment directive : Tw Estuary sensitive area (eutrophic) : submission (1997)
- Urine application dates: AC0213, Devon, 2012
- Weather data: AC0101, Devon, 2007
- Weather data: AC0101, Devon, 2008
- Weather data: AC0111, Devon, 2008-2009
- Weather data: AC0111, Devon, 2010
- Weather data: AC0111, Devon, 2010-2011
- Weather data: AC0116, Devon, 2011-2012
- Weather data: AC0116, Devon, 2012, urine
- Weather data: AC0116, Devon, 2013
- Weather data: AC0213, Devon, 2010
- Weather data: AC0213, Devon, 2010-2011
- Weather data: AC0213, Devon, 2011
- Weather data: AC0213, Devon, 2012
- Weather data: NT26, Devon, 2004
- Weather data: SLURRY-NR, Devon, 2004
- West and East Lyn Rivers : catchment action plan
- Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary
Click here to give feedback on this term or suggest an update. |