Tamar catchmentDefinition (http://ccmhub.net/category/find-your-local-catchment/tamar/) The Tamar catchment drains an area of about 1,800km2 in the South West River Basin District. The catchment is predominantly rural to the south are the Tamar estuary and the city of Plymouth where the majority of the population is based. Preferred Units: N/A Scope Note: N/A
Geographical Feature | Is Geographical Feature of |
---|
Tavy
| Devon
|
This term is used for the following terms: N/A Approved Date 17-Dec-2013 Items having a keyword relationship to this geographic term - 1996 general quality assessment (GQA) Cornwall area
- Ammonium laboratory method used by Hampshire Avon DTC consortium
- An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
- An investigation of the water quality in three Plymouth catchment streams
- Bank-side monitoring of river hydrology and water quality, Burracott, Neet catchment
- Bank-side monitoring of river hydrology and water quality, Caudworthy Water at Caudworthy Ford, Tamar catchment
- Biological study of Upper Tamar Lake 1997 : final report
- Continuous water quality monitoring results for the Upper Tamar
- Data for DTC Phase I from Hampshire Avon DTC Consortium
- Data from laboratory analysis for Burracott site, Neet catchment
- Data from laboratory analysis of water samples, Caudworthy Water at Caudworthy Ford, Tamar catchment
- Data from laboratory analysis of water samples, Winnacott Bridge at Caudworthy Ford, Tamar catchment
- Enhancing the River Tamar
- Freshwater Tamar : first annual review
- Freshwater Tamar and tributaries : consultation draft
- Freshwater Tamar and tributaries catchment management plan : action plan
- Freshwater Tamar and tributaries catchment management plan : consultation report
- Freshwater Tamar and tributaries plan from July 1999 to July 2004
- Freshwater Tamar catchment management plan : first annual review : April 1996 to March 1997
- Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
- Gunnislake fish counter : annual report 2002
- Hampshire Avon DTC Deposited Fine-grained Sediment Monitoring Dataset 2010-2013
- Hampshire Avon DTC Diatom Monitoring Data 2011-2013
- Hampshire Avon DTC Diatom Monitoring Dataset 2011-2013
- Hampshire Avon DTC Hydrology and Water Quality Monitoring
- Hampshire Avon DTC Macroinvertebrate Monitoring Data 2010-2013
- Hampshire Avon DTC Macroinvertebrate Monitoring Dataset 2010-2013
- Hampshire Avon DTC Macrophyte Monitoring Data 2011-2013
- Hampshire Avon DTC Macrophyte Monitoring Dataset 2011-2013
- Hydrology and water quality monitoring at Burracott, Neet catchment
- Hydrology and water quality monitoring, Caudworthy Water at Caudworthy Ford, Tamar catchment
- Hydrology and water quality monitoring, Winnacott Bridge at Caudworthy Ford, Tamar catchment
- Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
- Investigation into the intermittent failure of Wembury Beach to comply with EC bathing water
- Laboratory analysis of water samples, Burracott, Neet catchment
- Laboratory analysis of water samples, Caudworthy Water at Caudworthy Ford, Tamar catchment
- Laboratory analysis of water samples, Winnacott Bridge at Caudworthy Ford, Tamar catchment
- Managing flood risk river Tamar October 2006
- Monitored dissolved oxygen concentration, Caudworthy water at Caudworthy Ford, Tamar catchment
- Monitored flow rate at Burracott, Neet catchment
- Monitored flow rate, Caudworthy water at Caudworthy Ford, Tamar catchment
- Monitored pH values, Caudworthy water at Caudworthy Ford, Tamar catchment
- Monitored rainfall data at Burracott, Neet catchment
- Monitored river turbidity at Burracott, Neet catchment
- Monitored river turbidity, Caudworthy water at Caudworthy Ford, Tamar catchment
- Monitored water temperature, Caudworthy water at Caudworthy Ford, Tamar catchment
- Monitored water temperature, pH value and dissolved oxygen concentration at Burracott, Neet catchment
- Nitrate and nitrite laboratory method used by Hampshire Avon DTC consortium
- Nitrous oxide laboratory method used by Hampshire Avon DTC consortium
- NRA baseline estuary and coastal waters monitoring programme
- Phosphate laboratory method used by Hampshire Avon DTC consortium
- Progress Report June 1998
- Quality assurance and quality control protocols adopted by Hampshire Avon DTC consortium
- River Lyd diazinon contamination investigation - 1995 : final draft report
- River Lynher : catchment action plan
- River Lynher catchment river water quality classification 1990
- River Lynher catchment river water quality classification 1991
- River Meavy salmon and sea trout populations : assessment of the impact of flows
- River Plym : catchment action plan
- River Plym catchment river water quality classification 1990
- River Plym catchment river water quality classification 1991
- River Tamar (not Tavy and Lynher) : catchment action plan
- River Tamar annex 1A investigation : November 1996 COR/96/010
- River Tamar catchment management plan : draft consultation report : 1st draft internal consultation, Cornwall area catchment planning
- River Tamar catchment river water quality classification 1990
- River Tamar catchment river water quality classification 1991
- River Tamar EC dangerous substance directive failure 1993 : final draft report
- River Tamar EC freshwater fish directive failure 1994 : final draft report, June 1996 COR/96/005
- River Tamar marine index river : summary report of trapping of adult migratory salmonids at Gunnislake during 2003 season
- River Tamar salmon action plan : consultation report
- River Tavy alleviation of low flow project : Tavistock/Morwellham Canal : investigation into environmental impacts of proposed flow changes
- River Tavy catchment river water quality classification 1990
- River Tavy catchment river water quality classification 1991
- River Tavy EC Freshwater Fish Directive failure 1993
- River Tavy salmon action plan : consultation document
- River Yealm : catchment action plan
- River Yealm catchment river water quality classification 1990
- River Yealm catchment river water quality classification 1991
- Roadford operational and environmental study : interim report. Volume 1 : main report
- Roadford scheme environmental monitoring 1991/92 : Roadford fisheries liaison committee, 21 April 1992
- Salmon action plan : River Yealm
- Salmon and sea trout fishing in the estuary of the River Tavy : a review
- Supplemental inforrmation for field monitoring and laboratory analysis
- Surface water quality 1990
- Tamar estuary and tributaries : action plan
- Tamar estuary and tributaries : consultation report
- Tamar estuary and tributaries : first annual review
- Tamar Lakes project 2001 : initial assessment of nutrient data to identify pollution sources, assess the effect of Tamar Lakes on the downstream water quality and to recommend future monitoring requirements
- Total nitrogen and total phosphorus laboratory method used by Hampshire Avon consortium
Click here to give feedback on this term or suggest an update. |