Skip to main content
#Title
6051River Ribble catchment management plan : first annual review
6052Ribble action plan 2000-2005
6053Salmon action plan consultation : River Ribble, September 1999
6054River Ribble juvenile fish stock assessment 2003, with particular reference to salmonids
6055The Ribble Estuary 1992 surveys : summary of results
6056UK national monitoring plan : regional report for England and Wales : estuarine and intermediate sites (1991 to 1995)
6057Liggard Brook and Main Drain improvement scheme
6058Savick Brook electrofishing survey 2001
6059Wyre LEAP first annual review
6060An assessment of mercury contamination in the Red River catchment : final draft report
6061Red River (R23A003) EC Dangerous Substance Directive failure 1993 : final draft report
6062Mouth of a river lamprey,
6063Red River : catchment action plan
6064Severn Trent Region Plan Summary 1991/1992
6065Red River, Portreath, Bolingey and Perranporth catchment river water quality classification 1990
6066Red River catchment river water quality classification 1991
6067East Sussex Rother catchment management plan : action plan
6068East Sussex Rother catchment management plan : consultation report
6069Wastewater disinfection field trials (231/4/SW)
60701997 general quality assessment (GQA) and river ecosystem (RE) non-compliance : Devon area
6071A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
6072An investigation into possible causes of poor water quality at Blakewell Bridge (R30A001) on the Bradiford Water
6073An investigation into possible causes of poor water quality at Nymphayes Bridge (R30D009) on the Gissage Lake
6074Water quality monitoring locations 1992
6075An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96