Skip to main content
#Title
1301River Severn lower reaches catchment management plan : action plan : November 1995
1302River Sid : catchment action plan
1303River Tamar (not Tavy and Lynher) : catchment action plan
1304Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
1305Llyn Tegid dual pumping scheme : preliminary study report
1306River Wylye low flow study : progress and further investigations
1307River Wylye low flow study : progress and further investigations
1308East Devon public water supply strategy : surface water yield assessment - use of generated long flow records
1309Kennet and Coln river levels study. Volume one - River Kennet : final report
1310Kennet and Coln river levels study. Volume two - River Coln : final report
1311Low flow augmentation study, River Wensum : Phase 1 Stage 1 draft planning report
1312Stoke Ferry, Dec. 1990
1313A Status Report on the Direct Oxygenation of the Tywi Estuary - October 1989
1314Hydrogen Peroxide Dosing Trials, Lea Marston, 18 and 19 March 1996
1315An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
1316An investigation of the Madford River pollution incident of 29 July 1989 : November 1989
1317Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
1318Study into the effect of Chertsey STW on the North Arm of the River Bourne
1319Loe Pool urban waste water treatment directive sensitive area (eutrophic) designation : final draft report
1320A litter assessment of two major tributaries of the Taff, the Cynon and the Rhondda : surveyed March - April 1990
1321Alt Crossens action plan : October 1996
1322Bedford Ouse (lower reaches) LEAP : first annual review : May 2001
1323Mount's Bay and Lands End streams catchment river water quality classification 1991
1324Porth, Gluvian and Menalhyl catchment river water quality classification 1990
1325River Cober catchment river water quality classification 1991