6376 | Phosphate laboratory method used by Hampshire Avon DTC consortium |
6377 | Data from laboratory analysis of water samples, Wylye at Brixton Deverill site, Hampshire Avon catchment |
6378 | Data from laboratory analysis for Burracott site, Neet catchment |
6379 | Data from laboratory analysis for Ebble downstream site, Hampshire Avon catchment |
6380 | Data from laboratory analysis of water samples, Caudworthy Water at Caudworthy Ford, Tamar catchment |
6381 | Data from laboratory analysis at Ebble upstream site, Hampshire Avon catchment |
6382 | Data from laboratory analysis of water samples, Sem at Cool's Cottage site, Hampshire Avon catchment |
6383 | Data from laboratory analysis of water samples, Sem at Priors Farm, Hampshire Avon catchment |
6384 | Data from laboratory analysis of water samples, Winnacott Bridge at Caudworthy Ford, Tamar catchment |
6385 | Data from laboratory analysis of water samples, Wylye at Kingston Deverill site, Hampshire Avon catchment |
6386 | Newby Control Sub_Catchment Turbidity QC File |
6387 | Newby Beck Mitigation Sub-Catchment Discharge |
6388 | Newby Beck Control Sub-Catchment Discharge |
6389 | Pow Outlet Discharge Data |
6390 | Newby Beck Catchment Outlet Flow |
6391 | Thackthwaite Beck Control Sub-Catchment Monthly Grab Samples |
6392 | Thackthwaite Beck Mitigation Sub-Catchment Turbidity |
6393 | Newby Beck Control Sub-Catchment Turbidity |
6394 | Pow Beck Control Sub-Catchment Turbidity |
6395 | Thackthwaite Beck Control Sub-Catchment Turbidity |
6396 | Pow Beck Mitigation Sub-Catchment Discharge |
6397 | Thackthwaite Beck Mitigation Catchment Discharge |
6398 | Water related recreation strategy for the southern region : consultation draft 1997 |
6399 | West Cornwall : consultation report : June 1997 |
6400 | River Taw catchment management plan : action plan |