176 | East Looe river : river ecosystem (RE) non-compliance investigation : final draft report |
177 | River Eden and Solway Coast catchment management consultation report summary : October 1995 |
178 | Rivers Sid and Otter catchment management plan : consultation report |
179 | River Test Forum : 31.10.90 |
180 | Thackthwaite Beck Automatic Weather Station |
181 | Upper Nene catchment management plan : consultation report summary |
182 | Newby Control Sub_Catchment Turbidity QC File |
183 | River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region) |
184 | Newby Beck Mitigation Sub-Catchment Monthly Grab Samples |
185 | River Cherwell consultation report |
186 | The River Test |
187 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
188 | Pow Beck Outlet monthly grab samples |
189 | Lower Nene : options for resources : environmental asset survey : baseline report : final |
190 | An assessment of mercury contamination in the Red River catchment : final draft report |
191 | Anglian region shoreline monitoring data catalogue |
192 | Newby Beck Outlet monthly grab samples |
193 | Hysim model : modelling the flows of the River Deben |
194 | Pow Beck Control Sub-Catchment ISCO samples |
195 | Pow Control Sub-Catchment Turbidity QC File |
196 | Pow Beck Automatic Weather Station |
197 | River Otter low flow study : phase three report |
198 | Nene Valley water level management strategy : information status report |
199 | Pow AWS QC Flags |
200 | Newby Beck Mitigation Sub-Catchment Discharge |