126 | River Lynher catchment river water quality classification 1991 |
127 | River Dart salmon spawning target and compliance assessment |
128 | Second annual review of the Sid/Otter catchment management plan 1999 |
129 | Salmon and sea trout fishing in the estuary of the River Tavy : a review |
130 | River Avon catchment river water quality classification 1990 |
131 | Drought : the dry facts |
132 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
133 | The investigation of the Taff litter problem : report no. PL/EAE/89/2 |
134 | Investigation of the impact on water quality of the SWW Teign estuary sewerage trenching activity |
135 | River Teign salmon spawning target and compliance assessment |
136 | River Fowey catchment river water quality classification 1990 |
137 | River Lim catchment river water quality classification 1991 |
138 | River Plym catchment river water quality classification 1991 |
139 | River Gannel catchment river water quality classification 1990 |
140 | River Erme catchment river water quality classification 1991 |
141 | An investigation to find out why Holcombe Beach failed to comply with EC Bathing Waters Directive |
142 | South West regional pollution prevention and control |
143 | Rivers Avon and Gara catchments river water quality classification 1991 |
144 | Lower Colne improvement scheme November 1995 : Shire Ditch and Colne Brook, Uxbridge |
145 | The Loddon catchment, Thames : recommendations for statutory water quality objectives |
146 | Investigation into potential storm sewage discharge movements during spring and neap tides from Sharkham Point storm overflow |
147 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
148 | River Otter : environmental data review. Volume 3 : figures and tables : River Otter environmental study 1993/94 |
149 | Stanmoor Bank : feasibilty study and appraisal report. Alternative scheme options. Vol 2 : appendices D-I |
150 | Devon area internal report - further investigations into pipe discharges in the Lower Teign estuary |