Skip to main content
#Title
1201Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2012
1202Quality of Bathing Waters in Hampshire, Sussex, Kent and the Isle of Wight : 1993 Bathing Season : NRA Report DL/bw4/94
1203Micro low flows average and low flows estimation in the SW region : validation of regional version 1.1 software
1204The protection of East Anglian wetlands Phase 2 : review of BGS draft report. February 1995 (OI 558)
1205The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1206River Wissey investigations : linking hydrology and ecology : the basis for in-river flow management. Final Draft (OI/526/ )
1207Possible replacements for the biochemical oxygen demand (BOD) test and suspended solids as measures of effluent and water quality
1208Strategic Land Use Planning In Europe And Usa: Review Of Best Practice For The Environment Agency (Vol 1 Overview And Recommendations)
1209Audit of priority species of rivers and wetlands : Bittern Botaurus stellaris in South Hampshire and the Isle of Wight
1210River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region)
1211Audit of priority species of rivers and wetlands : white-clawed crayfish Austropotambius pallipes in South Hampshire and the Isle of Wight
1212Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1213Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)
1214Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1215NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1216Scoping Study For Collaborative R and D Between The Environment Agency And L'agence De L'eau Seine Normandie
1217Graphical representation of certain metals and organics concentrations versus flow rates for some of the rivers in Districts 3 and 6
1218Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1219Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2011
1220A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec
1221The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1222Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013
1223Letter of confirmation of geophysical surveys made in conjunction between Professor G.E.G. Sargent and the FBA 1983-1987
1224The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1225Analysis of natural and polluted river communities in Great Britain- Progress report for the period January-December 1987