226 | Second annual review of the River Torridge catchment management plan |
227 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
228 | Integrated pollution control and radioactive substances in the Anglian Region |
229 | The Yarrow catchment : recommendations for statutory water quality objectives |
230 | Our vision for the Thames Gateway : a showcase for sustainable development |
231 | Continuous water quality monitoring results for the Carnon river |
232 | Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
|
233 | Mercury and methylmercury in the river Yare, Norfolk (OI/420/8/A) |
234 | An investigation of sewage on the beach at Porthcothan |
235 | Fishery survey of the Bridgwater and Taunton Canal |
236 | The Swale, Ure and Ouse catchment (river factfiles) |
237 | Environmental snapshot for the East of England (summary report) |
238 | Second annual review of the River Taw catchment management plan |
239 | Biological water quality monitoring in the Midlands region |
240 | Water quality investigations in the Newlyn river catchment |
241 | The Loddon catchment, Thames : recommendations for statutory water quality objectives |
242 | Your guide to the Environment Agency - Thames Region - West Area |
243 | Cyanobacteria (blue-green algae) in the south west region 1989 |
244 | Summary of monitoring activities on the blackwater estuary |
245 | Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997 |
246 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
247 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
248 | Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996) |
249 | Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992 |
250 | Report of the Regional Environment Protection Advisory Committee (REPAC) for Thames Region of the Environment Agency : April 1999 - end of March 2000 |