151 | An investigation into the flow interactions between the Spilsby Sandstone and the overlying aquifers of East Lincolnshire |
152 | The Environment Agency's response to the House of Commons Environment Committee report on the environmental impact of cement manufacture |
153 | A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024 |
154 | The control of phosphorus in the catchment of the rivers Ant and Bure : 3rd annual report May 1989 |
155 | Assessment of the impact of discharges from Meldon Quarry on the water quality of the West Okement River |
156 | A litter assessment of two major tributaries of the Taff, the Cynon and the Rhondda : surveyed March - April 1990 |
157 | The Delineation and Characterisation of Groundwater Bodies to Meet the Requirements of the EU Water Framework Directive |
158 | The Transportation of the Maximum gain Salmon Spawning Target for the River Bush(N.I) to England and Wales |
159 | Thames estuary benthic programme : inferences on the pollution status of the Thames estuary from the macrobenthic community structure |
160 | Investigation into the probable cause of the 1999 failure of the EC bathing waters directive at Seaton (Devon) beach (70210103) (2000) |
161 | Planning for the rising tides - the Humber Estuary - consultation on managed realignment: information for the landowners and tenants - June 2002 |
162 | Discharge consent and compliance policy : a blueprint for the future : the NRA's response to the public consultation |
163 | Sustainable water resources for the future : values and challenges : consultation document for the Environment Agency's water resources strategies : the Anglian perspective |
164 | The impact of ferruginous minewater break-outs on the environmental quality of the Rivers Rhymney, Ebbw and Sirhowy : summary report |
165 | The modelling of water quality in the nitrate sensitive areas of the North Lincolnshire Wolds, Sleaford and Aswarby |
166 | Investigations into the extent of saline water ingress into the River Parrett and the River Tone : February, March 1994 |
167 | An appraisal of the options for the structure of the water resources function in Thames Region NRA |
168 | The Natural (Baseline) Quality Of Groundwaters In England And Wales - The Chalk Of Berkshire And The Chilterns |
169 | Radioactive Substances Act 1993 : response to comments on the Scope and methodology for the full re-examination of the Sellafield authorisations for the disposal of radioactive waste |
170 | The water environment - our cultural heritage |
171 | Surveying and tracking salmon in the sea |
172 | The Sea Trout Stock Collapse, 1989-1992 |
173 | Aerial view of the River Laboratory |
174 | Achieving the quality : annex : programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for individual water companies |
175 | Devon area internal report - the kingsbridge estuary - survey of the benthic microinvertebrate infauna (october 1990) for the proposed classification of estuaries in the south western region |