101 | The Seaton, Looe and Fowey catchment management plan : action plan |
102 | The Mersey Estuary 1992 surveys : summary of results |
103 | An investigation to determine the water quality of Churchstanton Stream |
104 | A survey of trace metals in biota of the Mersey estuary 1993 |
105 | Continuous water quality monitoring results for the Carnon river |
106 | Wyre estuary shoreline management plan : the Environment Agency's contribution to sustainable development |
107 | A second stage evaluation of the Grant YSI3815 Water Logger |
108 | The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall |
109 | An investigation of sewage on the beach at Porthcothan |
110 | An assessment of river water quality in the River Kenn |
111 | Fishery survey of the Bridgwater and Taunton Canal |
112 | Air dispersion climate from the Castle Cement works at Ribblesdale |
113 | Pesticide residues in fish taken from the Newlyn River (1992) |
114 | Environmental screening for the Merseyside objective 1 programme : environmental screening guidelines |
115 | Cyanobacteria (blue-green algae) in the south west region 1989 |
116 | Water quality investigations in the Newlyn river catchment |
117 | The River Alt/Crossens fish stock assessment 2001 |
118 | Investigations of discharges into the River Lemon at Newton Abbot |
119 | State of the environment report 2001 : West Midlands Region |
120 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
121 | Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992 |
122 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
123 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
124 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
125 | Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997 |