Skip to main content
#Title
101The Seaton, Looe and Fowey catchment management plan : action plan
102The Mersey Estuary 1992 surveys : summary of results
103An investigation to determine the water quality of Churchstanton Stream
104A survey of trace metals in biota of the Mersey estuary 1993
105Continuous water quality monitoring results for the Carnon river
106Wyre estuary shoreline management plan : the Environment Agency's contribution to sustainable development
107A second stage evaluation of the Grant YSI3815 Water Logger
108The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall
109An investigation of sewage on the beach at Porthcothan
110An assessment of river water quality in the River Kenn
111Fishery survey of the Bridgwater and Taunton Canal
112Air dispersion climate from the Castle Cement works at Ribblesdale
113Pesticide residues in fish taken from the Newlyn River (1992)
114Environmental screening for the Merseyside objective 1 programme : environmental screening guidelines
115Cyanobacteria (blue-green algae) in the south west region 1989
116Water quality investigations in the Newlyn river catchment
117The River Alt/Crossens fish stock assessment 2001
118Investigations of discharges into the River Lemon at Newton Abbot
119State of the environment report 2001 : West Midlands Region
120Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997
121Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992
122Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary
123Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989
124Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998
125Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997