51 | Environmental planning issues in the North Wessex area |
52 | Continuous water quality monitoring results for the Carnon river |
53 | An investigation of the water quality in three Plymouth catchment streams |
54 | An investigation into the bathing water quality at Porthallow |
55 | First annual review of the River Tone catchment management plan |
56 | Pesticide residues in fish taken from the Newlyn River (1992) |
57 | Cyanobacteria (blue-green algae) in the south west region 1989 |
58 | Quality audit of biological samples for the 1991 river quality survey |
59 | Investigations of discharges into the River Lemon at Newton Abbot |
60 | An assessment of river water quality in the River Kenn |
61 | The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall |
62 | The River Arun catchment management plan : action plan |
63 | Second annual review of the Sid/Otter catchment management plan 1999 |
64 | Fishery survey of the Bridgwater and Taunton Canal |
65 | Historic changes in the Upper River Ehen Catchment- Summary |
66 | A second stage evaluation of the Grant YSI3815 Water Logger |
67 | Reduction in aldrin and dieldrin concentrations in the Newlyn River |
68 | The Tame catchment management plan : consultation report summary : January 1996 |
69 | An investigation to determine the water quality of Churchstanton Stream |
70 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
71 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
72 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
73 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
74 | Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992 |
75 | Alleviation of low flow studies : the River Avon and its tributaries near Malmesbury : towards a solution |