Skip to main content
#Title
26Investigation into inputs in the Erme estuary and their effects on the bathing waters at Mothecombe
27Investigation of the water quality in the Buckland stream up and downstream of East/West Buckland
28An investigation into the water quality of the River Waldon during wet weather
29Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
30East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
31An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
32Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001)
33An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
34An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
35Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
36Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997)
37A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
38An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
39A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
40The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe
41An assessment of water quality in the River Yarty catchment
42Second annual review of the Seaton, Looe and Fowey catchment management plan
43Investigation into the cause of high phenols in Budleigh Brook (1998)
44The Seaton, Looe and Fowey catchment management plan : action plan
45Environmental planning issues in the North Wessex area
46Impact of breakwaters on the water quality of Sidmouth beach
47The Hartland Streams catchment management plan : action plan
48Non-compliance with water quality objectives on the Croyde stream (upper catchment)
49First annual review of the River Exe catchment management plan
50First annual review of the River Taw catchment management plan (1996)