51 | Water resources for the future : a summary of the strategy for Southern region |
52 | Investigation into the 1999 failure of the European Community bathing waters directive at Beer beach (2001) |
53 | SERPLAN development scenarios : the potential impact upon water resources in the SERPLAN region |
54 | Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR) |
55 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin |
56 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin : April 2000 |
57 | Investigation of the environmental impact of Coombe Farm on the Clapton Stream January 1992 |
58 | The Hydrogeological Classification of Superficial Clay: The Hydrogeological Characterisation of Glacial Till in east Anglia |
59 | Water resources for the future : a summary of the strategy for North East Region |
60 | Water resources for the future : a summary of the strategy for Thames Region Summary |
61 | Planning for the rising tides : the Humber estuary shoreline management plan. Summary of proposals |
62 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
63 | Response to questions posed by Northumbrian Water Authority, with special reference to the fisheries implications of the operation of the Kielder Water Scheme
|
64 | Darwell Transfer Scheme. Final Report Part II. Location of the draw-off tower in the Darwell Reservoir |
65 | Second interim report on the environmental impacts of the drought on Yorkshire's rivers April 1995 to April 1996 |
66 | A strategy for the management of the new South East Area Biology Team across a dual location following restructuring |
67 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
68 | Appendix to the biodiversity strategy and action plan for the Environment Agency (Thames Region) : costed action plan 2000-2003 |
69 | Evaluation of FRONTIERS accumulation forecasts in the NRA Thames and North West regions : final report of the Joint Met |
70 | An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley |
71 | The Adur and Ouse catchment abstraction management strategy : consultation document |
72 | An assessment of water quality in the River Yarty catchment |
73 | Partnership in planning : riverbank design guidance for the Tidal Thames |
74 | Your guide to the Environment Agency - Thames Region - West Area |
75 | State of the environment report for Thames Region : first update 2001 |