Skip to main content
#Title
1The restoration of the River Pang
2The management of the water resources of the Lark groundwater unit
3The effects of flow reduction in the River Dee on the aquatic environment
4The water bill : trickle irrigation
5The River Darent conservation project
6The Lambourn catchment modelling work
7A Report on the Drought on the River Darent
8Investigation into the cause of high pH in the Budleigh Brook
9The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society
10A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024
11Achieving the quality : annex : programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for individual water companies
12Hydropower developments and the National Rivers Authority
13Changes to the water abstraction licensing system
14Naturalisation of the Orton flow record
15The Possible effects on migratory fish in the River Dee of increased water abstraction
16Swords water quality study - phase 1 : modelling the water quality of the River Thames
17Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR)
18Exploration of the reasonable needs for new licences brought about by the Water Act 2003
19Investigation of the Relationship between the LIFE Index and RIVPACS: Putting LIFE into RIVPACS
20Water for the future in Kent : NRA response to the issues and options report
21Review of the water abstraction charges scheme : consultation document : summary of responses to the consultation
22The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994
23East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
24River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
25The Adur and Ouse catchment abstraction management strategy : consultation document