Skip to main content
#Title
1The Pearsall Building
2The Opening Ceremony of The River Laboratory
3Inflating the Lund Tubes
4The Ferry Boat, Windermere
5An aerial photograph of The Ferry House prior to the construction of The Pearsall Building
6Advertisement for the Letting of The Ferry Inn
7Assessment of the performance of the BMWP scoring system against biological targets and the determination of significant change
8Assessment of the impact of discharges from Meldon Quarry on the water quality of the West Okement River
9Aerial view of the River Laboratory
10Reed cutter used at the River Lab
11Bioaccumulation of metals in the Thames Estuary
12Biological investigation of the Common Lake Stream
13A demonstration of the use of a framework for the ecological risk assessment of land contamination
14The influence of zinc sulphate solution on the fauna of chalk stream channels
15Report on the control of discharges of titanium dioxide waste to the Humber Estuary : appendices
16Using Macrophytes for the Environmental Assessment of Rivers: The Role of Sediment Nutrients
17Biological investigation into the impact of the storm overflow at Middle Marwood Sewage Treatment Works
18Impact of the signal crayfish Pacifastacus leniusculus and its associated crayfishery on the River Thame
19Biological assessment of the effects of Ivybridge Sewage Treatment Works on the River Erme
20The impact of land use on salmonids (Report 30) : a study of the River Torridge catchment
21Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon
22Biological Assessment Methods: Controlling the Quality of Biological Data. Package 1 The variability of data used for assessing the biological condition of rivers
23Report on the results of a comparison of data from two surveys of the microfauna of the wash carried out in 1991 and 1993
24Investigations into the status of fisheries, biological and water quality in the River Pelenna catchment, prior to the treatment of discharges from abandoned coal mines : PL/EAW/95/3
25Survey of the biological quality of creek systems in the outer Thames Estuary, with special reference to the impact of STW and landfill site discharges