26 | The Adur and Ouse catchment abstraction management strategy : consultation document |
27 | Buckingham flood defence improvements : presentation of the preferred option |
28 | The Cam catchment, Anglian region : proposals for statutory water quality objectives |
29 | Valuing the Humber's environmental assets : proceedings of a seminar 15 November 2000 |
30 | Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
|
31 | The Ely Ouse catchment management plan : final plan : January 1994 |
32 | River Wissey investigations : linking hydrology and ecology : summary of a recommendations for the River Wissey (OI/526) |
33 | The impact of climate change on severe droughts: River-flow reconstructions and implied groundwater levels |
34 | Old Bedford incorporating the Middle Level and Ouse Washes : action plan - April 1998 |
35 | Old Bedford incorporating the Middle Level and Ouse Washes : consultation report - May 1997 |
36 | Old Bedford incorporating the Middle Level and Ouse Washes : second annual review : July 2000 |
37 | Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey |
38 | Scope for growth and levels of contaminants in mussels from the Wash. Phase 2 |
39 | River Wissey investigations : linking hydrology and ecology : the basis for in-river flow management. Final Draft (OI/526/ ) |
40 | Environmental assessment of Denver MRF : impact of freshwater flow on water quality of the Great Ouse estuary : draft working paper 3 |