1251 | Gorran Haven (Little Perhaver) EC bathing waters directive failure 1996 : an investigation of the Gorran Haven Stream |
1252 | Scoping Study For Collaborative R and D Between The Environment Agency And L'agence De L'eau Seine Normandie |
1253 | Graphical representation of certain metals and organics concentrations versus flow rates for some of the rivers in Districts 3 and 6 |
1254 | Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality |
1255 | Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2011 |
1256 | A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec |
1257 | The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
|
1258 | Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 1 : report and executive summary |
1259 | Manor Wall and Landguard Fort sea defences, Felixstowe : part of the Southern Felixstowe coastal strategy option selection scoping consultation document |
1260 | Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013 |
1261 | Letter of confirmation of geophysical surveys made in conjunction between Professor G.E.G. Sargent and the FBA 1983-1987 |
1262 | The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon |
1263 | Analysis of natural and polluted river communities in Great Britain- Progress report for the period January-December 1987 |
1264 | Low flows and water resources : facts on the top 40 low flow rivers in England and Wales |
1265 | Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990 |
1266 | Micro low flows average and low flow estimation in the SW region : validation of version 1.2 software |
1267 | An investigation into the best method to combine national and local data to develop site-specific critical loads |
1268 | Developing Quality Assurance for Fish Counter Data - Phase 1: An Assessment of the Salmonid Fish Counter Network in England and Wales |
1269 | Development of Environmental Standards (Water Resources) Stage 1: Identification of Hydro-morphological parameters to which the aquatuc ecosystems is sensitive |
1270 | Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D |
1271 | NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging |
1272 | Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government |
1273 | Remote sensing and baseline monitoring of the coastal waters of England and Wales 1992-1993 : a survey report |
1274 | The River Conwy catchment management plan : action plan (bilingual) : 1995: Cynllun Gweithrediad Cynllun Rheoli Dalgylch yr Afon Conwy 1995 |
1275 | Water wise : are you pouring money down the drain? (Bilingual) : Doeth a dwr : ydych chi'n tywallt arian i lawr y draen? |