Skip to main content
#Title
101A report on the 1992 strategic stock assessment survey of the upper Eden catchment with particular reference to salmonids
102River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
103Conservation and recreation : the Wye challenge : towards a management strategy for the River Wye : summary report (bilingual)
104Modelling the contribution from non-agricultural sources to nitrate pollution in the Sor Brook (Thames Region) (UC 3134)
105Analysis of benthic macro-invertebrate samples collected by the NRA during 1989 and 1990 from various habitats in the River Delph
106An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
107An investigation into the frequency of discharge of three combined sewer overflows in the Afan/Kenfig catchment : TM/EAW/96/06
108Options for transfer of water from the River Trent and reservoir storage at Great Bradley : technical summary of the feasibility report
109The Cam catchment : recommendations for statutory water quality objectives
110The River Cam catchment management plan : annual monitoring report
111Algal blooms in the Lower Tees- Perspectives and prospects
112Statement on public consultation for the Dove CMP : July 1995
113Water from the River Dee : a working partnership
114The Mersey estuary : a report on environmental quality
115Investigation into the cause of high phenols in Budleigh Brook (1998)
116Time of travel on the [River] Chertsey Bourne under low flow conditions
117An environmental snapshot for the Anglian region 2003
118Contribution of small streams to potential fish production in the Conwy catchment
119The ecology and management of riverine trees : interim report
120Policy and practice for the protection of groundwater - Thames region appendix
121The Yarrow catchment : recommendations for statutory water quality objectives
122Mercury and methylmercury in the river Yare, Norfolk (OI/420/8/A)
123Fine sediment deposition in the River Keer : geomorphological assessment
124The Adur and Ouse catchment abstraction management strategy : consultation document
125First annual review of the River Exe catchment management plan