Skip to main content
#Title
76Fisheries of the middle and lower Wylye and factors affecting their performance
77Method for assessing the heritage value of net fisheries
78Medway Estuary fisheries survey 2000 : (incorporating the report for 1997 to 2000)
79Further Validation of PHABSIM for the Habitat Requirements of Salmonid Fish
80Estuarial migration of Atlantic salmon in the river Dee (North Wales)
81The NRA in business : annual review and summary accounts 1993-94
82Catch and release: the survival and behaviour of Atlantic salmon angled and returned to the Aberdeenshire Dee, in spring and early summer
83Use of rod catch-effort data to monitor migratory salmonids in Wales : a report submitted in part fulfillment of the requirements of the course
84An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95]
85River Meavy salmon and sea trout populations : assessment of the impact of flows
86Problems and solutions in the management of open seas fisheries for Atlantic salmon
87The Warwickshire Avon catchment management plan : consultation report summary (NRA Severn-Trent 44)
88Lower Colne catchment management plan for flood defence and the environment : third draft
89Economic evaluation of inland fisheries: The economic impact of freshwater angling in England and Wales
90Analysis of bacteriological contamination and accumulation of metals and organics in the mussel (Mytilus edulis)
91Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993
92Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
93River Stort : draft catchment management plan for flood defence and the environment : May 1991
94The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
95Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
96Analysis of growth and survival of sea trout from the Welsh Dee: Interim Report, 2nd April 2000
97The Warwickshire Avon catchment management plan : first annual review : October 1994 - October 1995 (NRA Severn -Trent 45)
98An investigation into possible causes of poor water quality at Blakewell Bridge (R30A001) on the Bradiford Water
99Developing Quality Assurance for Fish Counter Data - Phase 1: An Assessment of the Salmonid Fish Counter Network in England and Wales
100Library and information services of the Instituto de Investigacao Pesqueiras, Angola. Report of a two week consultancy 20 July to 3 August