Skip to main content
#Title
26An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
27Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001)
28An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
29An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
30Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997)
31A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
32An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
33A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
34An assessment of water quality in the River Yarty catchment
35Second annual review of the Seaton, Looe and Fowey catchment management plan
36Investigation into the cause of high phenols in Budleigh Brook (1998)
37The Seaton, Looe and Fowey catchment management plan : action plan
38Impact of breakwaters on the water quality of Sidmouth beach
39The Hartland Streams catchment management plan : action plan
40First annual review of the River Exe catchment management plan
41First annual review of the River Taw catchment management plan (1996)
42Quality audit of biological samples for the 1991 river quality survey
43Investigations of discharges into the River Lemon at Newton Abbot
44Public water supplies in the NRA - Wessex Region : initial report 1990
45Second annual review of the Taw / Torridge Estuary catchment management plan
46Malodours and discolouration on the Wool Brook Sidmouth
47Second annual review of the Sid/Otter catchment management plan 1999
48Artificial recharge to groundwater in the Otter valley
49Impact of reservoir construction construction on the Bruckland Stream
50Report on the survey of SBM handlers in Devon