26 | First annual review of the River Exe catchment management plan |
27 | First annual review of the River Taw catchment management plan (1996) |
28 | Quality audit of biological samples for the 1991 river quality survey |
29 | Malodours and discolouration on the Wool Brook Sidmouth |
30 | Artificial recharge to groundwater in the Otter valley |
31 | Non-compliance of the Bidwell Brook with river quality objectives |
32 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
33 | An investigation to determine the water quality of Churchstanton Stream |
34 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
35 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
36 | A study to investigate and propose remedies for river quality problems in the Madford catchment |
37 | National marine baseline survey 1995 : littoral cell 7 : Lands End to the Severn Estuary |
38 | Devon area internal report - further investigations into pipe discharges in the Lower Teign estuary |
39 | The disposal of sheep dip waste (R and D Report 11) : effects on water quality |
40 | Investigation into the frequency of storm overflow operation at Bradworthy sewage treatment works (1996) |
41 | Two year aesthetic survey of beaches in the South West (1990 and 1991) |
42 | An investigation into possible causes of poor water quality at Blakewell Bridge (R30A001) on the Bradiford Water |
43 | An investigation to determine if Deep Moor Landfill Site is causing an impact downstream in the Peagham Stream |
44 | An investigation into possible causes of poor water quality at Nymphayes Bridge (R30D009) on the Gissage Lake |
45 | Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001) |