Skip to main content
#Title
26First annual review of the River Exe catchment management plan
27First annual review of the River Taw catchment management plan (1996)
28Quality audit of biological samples for the 1991 river quality survey
29Malodours and discolouration on the Wool Brook Sidmouth
30Artificial recharge to groundwater in the Otter valley
31Non-compliance of the Bidwell Brook with river quality objectives
32First annual review of the Taw/Torridge estuary catchment management plan (1996)
33An investigation to determine the water quality of Churchstanton Stream
34Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary
35Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997
36A study to investigate and propose remedies for river quality problems in the Madford catchment
37National marine baseline survey 1995 : littoral cell 7 : Lands End to the Severn Estuary
38Devon area internal report - further investigations into pipe discharges in the Lower Teign estuary
39The disposal of sheep dip waste (R and D Report 11) : effects on water quality
40Investigation into the frequency of storm overflow operation at Bradworthy sewage treatment works (1996)
41Two year aesthetic survey of beaches in the South West (1990 and 1991)
42An investigation into possible causes of poor water quality at Blakewell Bridge (R30A001) on the Bradiford Water
43An investigation to determine if Deep Moor Landfill Site is causing an impact downstream in the Peagham Stream
44An investigation into possible causes of poor water quality at Nymphayes Bridge (R30D009) on the Gissage Lake
45Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)