Skip to main content
#Title
1After the flood : 50 years of inland flood protection in East Anglia
2The River Test
3The River Test. 1991.
4Enhancing the River Otter
5The Hull catchment (river factfiles)
6Battling the tide : flood defences in the Anglian region
7Hysim model : modelling the flows of the River Deben
8Naturalisation of the Orton flow record
9Navigations in the Anglian region (EA)
10Navigations in the Anglian Region (NRA)
11Recreational waterways in the Anglian region : byelaws
12Action plan for the management of salmon for the River Test : consultation document
13The Effect of Atrazine Exposure on the Timing of Salmon (Salmo salar L.) Smolt Emigration
14Preliminary assessment of the ability of Restormel fish counter to enumerate the passage of migratory salmonids on the River Fowey : Cornwall Area Fisheries Science Team
15Analysis of benthic macro-invertebrate samples collected by the NRA during 1989 and 1990 from various habitats in the River Delph
16An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
17Second annual review of the Sid/Otter catchment management plan 1999
18Second annual review of the Seaton, Looe and Fowey catchment management plan
19Investigation of mercury contamination in the Red River catchment, West Cornwall
20User notes for the Deben groundwater modelling package
21Benchmarking rainfall runoff models within the Anglian Region : final report
22Guide to freshwater fishing in the Northern area of Anglian Region
23The Upper Nene catchment management plan : final plan : August 1994
24The Rivers Test and Itchen : salmon management plan : a consultation document
25Investigations of discharges into the River Lemon at Newton Abbot