26 | The Rivers Test and Itchen : salmon management plan : a consultation document |
27 | Investigations of discharges into the River Lemon at Newton Abbot |
28 | Second annual review of the Sid/Otter catchment management plan 1999 |
29 | Artificial recharge to groundwater in the Otter valley |
30 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
31 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
32 | The impact of climate change on severe droughts: River-flow reconstructions and implied groundwater levels |
33 | An assessment of mercury contamination in the Red River catchment : final draft report |
34 | Macrophyte status of the Rivers Test and Itchen - Hampshire : summary report - October 1998 |
35 | Low flows and water resources : facts on the top 40 low flow rivers in England and Wales |
36 | Audit of priority species of rivers and wetlands : Southern Damselfly Coenagrion mercuriale in South Hampshire and the Isle of Wight |
37 | River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region) |
38 | Chironomids as indicators of biological quality : present use and future potential : a report of a workshop held at the Environment Agency, Thames Region |