76 | Phosphate in the cut-off channel |
77 | Guide to the Medway navigation 1994 |
78 | The River Lark project Final Report |
79 | The Ely Ouse Essex water transfer scheme |
80 | The Nidd and Wharfe catchment (river factfiles) |
81 | Study of the behaviour and impact of two sewage treatment works of the Thames catchment |
82 | Investigation into the chemicals present and entering the Stover Lake, Stover Country Park |
83 | The water protection zone (River Dee catchment) designation order : supplementary paper in support of the application |
84 | A review of the performance of Aldershot STW and its effect on the River Blackwater |
85 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin : April 2000 |
86 | An investigation into the water quality of the River Waldon during wet weather |
87 | Investigation into the 1999 failure of the European Community bathing waters directive at Beer beach (2001) |
88 | Impact of the signal crayfish Pacifastacus leniusculus and its associated crayfishery on the River Thame |
89 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin |
90 | Rising groundwater levels in the chalk - basal sands aquifer of the central london basins |
91 | Water resources for the future : a summary of the strategy for Thames Region |
92 | Conservation and recreation: the Wye challenge: volume 1: report of the River Wye project |
93 | Estuarine fish survey 1989 : inferences on the pollution status of the Thames estuary |
94 | The Effect of Atrazine Exposure on the Timing of Salmon (Salmo salar L.) Smolt Emigration |
95 | Biological assessment of the effects of Ivybridge Sewage Treatment Works on the River Erme |
96 | A Status Report on the Direct Oxygenation of the Tywi Estuary - October 1989 |
97 | An investigation into the effects of Alton sewage works on the River Wey North |
98 | Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon |
99 | Protecting your future : tackling flooding in the Thames Estuary through the 21st century |
100 | Report for Anglian Water, NRA Unit on the uses of the Orwell and the Stour Estuaries and the use of the mathematical model to derive long term consent limits for all inputs to Orwell Estuary |