Skip to main content
#Title
126An investigation to determine the water quality of Churchstanton Stream
127The Loddon catchment, Thames : recommendations for statutory water quality objectives
128An investigation of the water quality in three Plymouth catchment streams
129Post drought soil water recharge : a study of the processes of recharge
130Second annual review of the River Torridge catchment management plan
131Second annual review of the Seaton, Looe and Fowey catchment management plan
132Our vision for the Thames Gateway : a showcase for sustainable development
133Environmental planning issues in the North Wessex area
134Continuous water quality monitoring results for the Carnon river
135An investigation of sewage on the beach at Porthcothan
136Fishery survey of the Bridgwater and Taunton Canal
137Second annual review of the River Taw catchment management plan
138The River Itchen salmon action plan : consultation document
139Water quality investigations in the Newlyn river catchment
140Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary
141Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989
142Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997
143Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992
144An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95]
145Report of the Regional Environment Protection Advisory Committee (REPAC) for Thames Region of the Environment Agency : April 1999 - end of March 2000
146Alleviation of low flow studies : the River Avon and its tributaries near Malmesbury : towards a solution
147Investigation into the intermittent failure of Wembury Beach to comply with EC bathing water
148Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
149Report on the By Brook low flow investigations : October 2001 : volume 2 : (figures, maps and appendices)
150Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996