1076 | The available resource methodology : a framework for assessing water resources and abstraction availability : final report |
1077 | The Impact Of Discarded Fishing Line And Tackle On Mute Swans - Phase 1 |
1078 | Manual for the use of herbicides in or near water : April 1993 : final draft report |
1079 | Direct toxicity assessment : a step towards better environmental protection within the UK : business strategy |
1080 | Analysis of airborne platform specifications and operations for the National Rivers Authority by Atlantique Reconnaissance Ltd |
1081 | Effectiveness of eutrophication control by phosphorus reduction: development of the INCA-P model |
1082 | The evaluation of a pHOX model 962 hand-held dissolved oxygen meter (220/28/T) |
1083 | The evaluation of a WTW model OXI 196 hand-held dissolved oxygen meter (220/29/T) |
1084 | The evaluation of a YSI model 58 hand-held dissolved oxygen meter (220/24/T) |
1085 | The evaluation of an ABB Kent-Taylor model 7135 hand-held dissolved oxygen meter (220/30/T) |
1086 | Definition of terms used in the assessment information management system (AIMS) : guidance note 5 |
1087 | Time of travel study on the River Wandle under two different flow conditions |
1088 | The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria |
1089 | Biological river quality 1995 according to the general quality (GQA) scheme [map] : scale 1 : 750 000 |
1090 | Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses |
1091 | Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993 |
1092 | Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria |
1093 | River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region) |
1094 | Scope for growth and levels of contaminants in mussels from the Wash. Phase 2 |
1095 | River Stort : draft catchment management plan for flood defence and the environment : May 1991 |
1096 | Catchment management plans : protecting and enhancing the water environment in an integrated manner |
1097 | Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd |
1098 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2012 |
1099 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2011 |
1100 | YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2013 |