Skip to main content
#Title
1276Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1277Possible replacements for the biochemical oxygen demand (BOD) test and suspended solids as measures of effluent and water quality
1278Strategic Land Use Planning In Europe And Usa: Review Of Best Practice For The Environment Agency (Vol 1 Overview And Recommendations)
1279Audit of priority species of rivers and wetlands : Bittern Botaurus stellaris in South Hampshire and the Isle of Wight
1280River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region)
1281Audit of priority species of rivers and wetlands : white-clawed crayfish Austropotambius pallipes in South Hampshire and the Isle of Wight
1282Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1283Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)
1284Gorran Haven (Little Perhaver) EC bathing waters directive failure 1996 : an investigation of the Gorran Haven Stream
1285Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1286NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1287Scoping Study For Collaborative R and D Between The Environment Agency And L'agence De L'eau Seine Normandie
1288Graphical representation of certain metals and organics concentrations versus flow rates for some of the rivers in Districts 3 and 6
1289Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1290Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2011
1291A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec
1292The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1293Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 1 : report and executive summary
1294Manor Wall and Landguard Fort sea defences, Felixstowe : part of the Southern Felixstowe coastal strategy option selection scoping consultation document
1295Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013
1296Letter of confirmation of geophysical surveys made in conjunction between Professor G.E.G. Sargent and the FBA 1983-1987
1297Investigating the feasibility of using neural networks to derive chlorophyll a prediction algorithms for case 2 waters
1298The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1299Analysis of natural and polluted river communities in Great Britain- Progress report for the period January-December 1987
1300Low flows and water resources : facts on the top 40 low flow rivers in England and Wales