Skip to main content
#Title
401Development of the Acid Water Indicator Community (AWIC) Macroinvertebrate Family and Species Level
402Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey
403The Impact Of Discarded Fishing Line And Tackle On Mute Swans - Phase 1
404Effectiveness of eutrophication control by phosphorus reduction: development of the INCA-P model
405An investigation of the Madford River pollution incident of 29 July 1989 : November 1989
406Monitoring the effects of a combined sewer overflow discharge to a small watercourse in South Wales
407Time of travel study on the River Wandle under two different flow conditions
408Biological river quality 1995 according to the general quality (GQA) scheme [map] : scale 1 : 750 000
409Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993
410Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria
411River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
412River Stort : draft catchment management plan for flood defence and the environment : May 1991
413Catchment management plans : protecting and enhancing the water environment in an integrated manner
414The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
415Micro low flows average and low flows estimation in the SW region : validation of regional version 1.3 software
416Mercury and methylmercury in the river Yare, Norfolk (1986 - 1992) (OI/420/8/A annex) : annex to main report
417Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)
418The development of macroinvertebrate keys using TWINSPAN classification : a manual for NRA biologists (001/10/W) : draft final report
419Micro low flows average and low flow estimation in the SW region : validation of version 1.2 software
420River Stour (2), Sudbury : report of a river corridor survey carried out for the National Rivers Authority, Anglian region
421River Wissey investigations : linking hydrology and ecology : the basis for in-river flow management. Final Draft (OI/526/ )
422The Warwickshire Avon catchment management plan : first annual review : October 1994 - October 1995 (NRA Severn -Trent 45)
423Analysis of natural and polluted river communities in Great Britain- Progress report for the period January-December 1987
424Low flows and water resources : facts on the top 40 low flow rivers in England and Wales
425Environmental assessment of Denver MRF : impact of freshwater flow on water quality of the Great Ouse estuary : draft working paper 3