Skip to main content
#Title
201Conservation and recreation : the Wye challenge : towards a management strategy for the River Wye : summary report (bilingual)
202An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
203Water quality objectives: procedures used by the NRA for the purpose of surface waters river ecosystem) (classification) regulations 1994
204Mercury, methylmercury and copper in the River Yare, Norfolk : summary of a report to the National Rivers Authority, Anglian Region
205A preliminary investigation into the extent of saline ingress into Curry Moor from the River Tone, January 1994
206Options for development of an enhanced team culture in the NRA, using the Welsh Regional Technical Department as an example
207An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 1998-March 1999
208An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
209The Adur and Ouse catchment abstraction management strategy : consultation document
210River Axe Fish Study - Evaluation of Fish Movements in the Estuary
211Water quality investigations in the Newlyn river catchment
212Dead zones, live markers: the biological environments of larger U.K. Rivers
213An assessment of water quality in the River Yarty catchment
214Fisheries of the middle and lower Wylye and factors affecting their performance
215Mercury and methylmercury in the river Yare, Norfolk (OI/420/8/A)
216Ecotoxicology : a report of the NRA R and D Ecotoxicology Group
217The Impact Of Particulate Outputs Associated With Timber Harvesting
218Second annual review of the Seaton, Looe and Fowey catchment management plan
219An Investigation of Ecological Change in the Rivers Kennet and Lambourn
220The Seaton, Looe and Fowey catchment management plan : action plan
221Fine sediment deposition in the River Keer : geomorphological assessment
222Quality audit of biological samples for the 1990 river quality survey
223Environmental planning issues in the North Wessex area
224The Dove catchment management plan : consultation report summary : January 1995
225Continuous water quality monitoring results for the Carnon river