Skip to main content
#Title
51Water resources for the future : a summary of the strategy for Thames Region
52Bacterial quality of the bathing waters at Seaton, Cornwall, and of the River Seaton
53Environmental monitoring of the Fal Estuary to support the Fal Swan study : final draft report
54The Effect of Atrazine Exposure on the Timing of Salmon (Salmo salar L.) Smolt Emigration
55Water resources for the future : a summary of the strategy for North East Region
56A study of the mayfly parasite Spiriopsis adipophila, Arvy and Peters (1972) (=Sprininella adipophila, Arvy and Delage 1966) in Ephemera danica from the River Pang, a tributary of the River Thames
57Preliminary assessment of the ability of Restormel fish counter to enumerate the passage of migratory salmonids on the River Fowey : Cornwall Area Fisheries Science Team
58An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 1998-March 1999
59An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
60Evaluation of FRONTIERS accumulation forecasts in the NRA Thames and North West regions : final report of the Joint Met
61An investigation of ecological change in the rivers Kennet and Lambourn. Progress report for the period April 1999-March 2000
62Options for transfer of water from the River Trent and reservoir storage at Great Bradley : technical summary of the feasibility report
63A preliminary investigation into the extent of saline ingress into Curry Moor from the River Tone, January 1994
64An investigation of ecological change in the rivers Kennet and Lambourn. Progress report for the period April 1999-March 2001
65An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 2000 - March 2001
66Second interim report on the environmental impacts of the drought on Yorkshire's rivers April 1995 to April 1996
67A report on the River Chew at Chewton Mendip, 6th August 1992
68The Adur and Ouse catchment abstraction management strategy : consultation document
69Impact of reservoir construction construction on the Bruckland Stream
70Water resources for the future : a strategy for North East Region
71Eel and elver studies in the Severn : interim report (256/6/ST)
72Reduction in aldrin and dieldrin concentrations in the Newlyn River
73Water quality investigations in the Newlyn river catchment
74The River Cam catchment management plan : annual monitoring report
75An investigation of sewage on the beach at Porthcothan