Skip to main content
#Title
101Identification of water quality problems in the Strat and Neet catchments
102Second annual review of the Upper Bristol Avon catchment management plan
103The Swale, Ure and Ouse catchment (river factfiles)
104The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall
105The River Arun catchment management plan : action plan
106The Test catchment southern : recommendations for statutory water quality objectives
107The River Thame : catchment review : first draft - 16th Februrary 1996
108Second annual review of the Lower Bristol Avon catchment management plan
109The Don, Rother and Dearne catchment (river factfiles)
110The River Itchen salmon action plan : consultation document
111The Tame catchment management plan : consultation report summary : January 1996
112Contribution of small streams to potential fish production in the Conwy catchment
113Bacteriological monitoring of freshwater rivers in the Thames Region 1995
114Fishery survey of the Bridgwater and Taunton Canal
115Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998
116A macroinvertebrate survey of the Releath stream and associated tributaries within the vicinity of Trevethan Farm : final draft report - Water Quality section, Cornwall area
117Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998
118Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992
119Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989
120An assessment of mercury contamination in the Red River catchment : final draft report
121Annual review of the Colne, Upper Lee, North London and Roding, Beam and Ingerbourne catchments
122Macrophyte status of the Rivers Test and Itchen - Hampshire : summary report - October 1998
123Greatham Creek tidal defences inter regional review : prepared for the purposes of legal proceedings
124Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey
125National marine baseline survey 1995 : littoral cell 2 : Flamborough Head to the Wash