76 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
77 | An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991) |
78 | Interim report on the environmental impacts of the drought on Yorkshire rivers April 1995 to April 1996 |
79 | Bioccumulation of halogenated compounds by limpets and fucoid seaweeds in the vicinity by the Black Rock sewage outfall, Weston-Super-Mare |
80 | A preliminary investigation into the extent of saline ingress into Curry Moor from the River Tone, January 1994 |
81 | A strategy for the management of the new South East Area Biology Team across a dual location following restructuring |
82 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
83 | An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989 |
84 | Appendix to the biodiversity strategy and action plan for the Environment Agency (Thames Region) : costed action plan 2000-2003 |
85 | The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe |
86 | Final report of the controlled cohort investigations into the health effects of bathing in sewage contaminated coastal waters |
87 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
88 | Water quality investigations in the Newlyn river catchment |
89 | An investigation of sewage on the beach at Porthcothan |
90 | Partnership in planning : riverbank design guidance for the Tidal Thames |
91 | Your guide to the Environment Agency - Thames Region - West Area |
92 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
93 | A survey of ferruginous minewater impacts in the Welsh coalfields |
94 | State of the environment report for Thames Region : first update 2001 |
95 | The Seaton, Looe and Fowey catchment management plan : action plan |
96 | Environmental planning issues in the North Wessex area |
97 | Continuous water quality monitoring results for the Carnon river |
98 | An investigation of the water quality in three Plymouth catchment streams |
99 | An investigation into the bathing water quality at Porthallow |
100 | First annual review of the River Tone catchment management plan |