101 | Regulation guidance and direction making powers in the Environment Act 1995 in relation to the Environment Agency |
102 | River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team |
103 | Options for development of an enhanced team culture in the NRA, using the Welsh Regional Technical Department as an example |
104 | Conservation and recreation : the Wye challenge : towards a management strategy for the River Wye : summary report (bilingual) |
105 | Sustainable water resources for the future : values and challenges : consultation document for the Environment Agency's water resources strategies |
106 | River Habitat Quality the physical character of rivers and streams in the UK and Isle of Man |
107 | A strategy for the management of the new South East Area Biology Team across a dual location following restructuring |
108 | An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley |
109 | Guidance notes for local planning authorities on the methods of protecting the water environment through development plans |
110 | Environmental snapshot for the East of England [version 1] |
111 | Snapshots of the environment : integrated river basin management |
112 | The regulation of salmon angling in Great Britain
|
113 | Corporate Environmental Reporting in the UK Water Sector - A Concise Review |
114 | Improving the contribution of social science to Flood Risk Management |
115 | Links and Interactions Between the RBMPs and Development Plans in Scotland |
116 | Model For Investigating The Impacts Of Groundwater Abstraction |
117 | Buckingham flood defence improvements : presentation of the preferred option |
118 | The Adur and Ouse catchment abstraction management strategy : consultation document |
119 | Charging for discharges scheme : guidance to the engineering industry |
120 | Suffolk estuarine strategies : Alde and Ore estuary strategy : introduction to the strategy |
121 | An assessment of water quality in the River Yarty catchment |
122 | The Warwickshire Avon catchment management plan : final plan : October 1994 |
123 | Statement on public consultation for the Dove CMP : July 1995 |
124 | The Upper Nene catchment management plan : final plan : August 1994 |
125 | Managing water abstraction : the catchment abstraction management strategy process : updated July 2002 |