1376 | Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality |
1377 | Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2011 |
1378 | A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec |
1379 | The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
|
1380 | Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 1 : report and executive summary |
1381 | Analogue (nutrient), YSI, turbidity and stage data for the Wensum Demontration Test Catchment's monitoring kiosk E in 2013 |
1382 | Letter of confirmation of geophysical surveys made in conjunction between Professor G.E.G. Sargent and the FBA 1983-1987 |
1383 | Foot and Mouth Disease Epidemic. Disposal of culled stock by burial : guidance and reference data for the protection of controlled waters |
1384 | The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon |
1385 | Analysis of natural and polluted river communities in Great Britain- Progress report for the period January-December 1987 |
1386 | Low flows and water resources : facts on the top 40 low flow rivers in England and Wales |
1387 | An investigation to determine if Deep Moor Landfill Site is causing an impact downstream in the Peagham Stream |
1388 | The faunal richness of headwater streams. Stage 3 : impact of agricultural activities. Volume 2 : appendices (Note 392) |
1389 | Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990 |
1390 | Sea trout gene banks : the feasibility of developing and utilising gene banks for sea trout (salmo trutta) conservation |
1391 | Micro low flows average and low flow estimation in the SW region : validation of version 1.2 software |
1392 | An investigation into the best method to combine national and local data to develop site-specific critical loads |
1393 | Developing Quality Assurance for Fish Counter Data - Phase 1: An Assessment of the Salmonid Fish Counter Network in England and Wales |
1394 | Development of Environmental Standards (Water Resources) Stage 1: Identification of Hydro-morphological parameters to which the aquatuc ecosystems is sensitive |
1395 | Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D |
1396 | NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging |
1397 | Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government |
1398 | Remote sensing and baseline monitoring of the coastal waters of England and Wales 1992-1993 : a survey report |
1399 | The River Conwy catchment management plan : action plan (bilingual) : 1995: Cynllun Gweithrediad Cynllun Rheoli Dalgylch yr Afon Conwy 1995 |
1400 | Water wise : are you pouring money down the drain? (Bilingual) : Doeth a dwr : ydych chi'n tywallt arian i lawr y draen? |