Skip to main content
#Title
76Bioccumulation of halogenated compounds by limpets and fucoid seaweeds in the vicinity by the Black Rock sewage outfall, Weston-Super-Mare
77An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
78An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
79Quality audit of biological samples for the 1991 river quality survey
80Lakes, Ponds and Reservoirs in the Southern Region (NRA)
81Identification of water quality problems in the Strat and Neet catchments
82Second annual review of the Sid/Otter catchment management plan 1999
83Second annual review of the Seaton, Looe and Fowey catchment management plan
84The Yarrow catchment : recommendations for statutory water quality objectives
85The Adur and Ouse catchment abstraction management strategy : consultation document
86Environmental protection and pollution control : in the North West
87Investigation of mercury contamination in the Red River catchment, West Cornwall
88Macroinvertebrates of the River Nar : Great Ouse catchment : draft report
89Report on the quality of bathing waters 1990
90Reduction in aldrin and dieldrin concentrations in the Newlyn River
91Historic changes in the Upper River Ehen Catchment- Summary
92Quality audit of biological samples for the 1990 river quality survey
93The Tame catchment management plan : consultation report summary : January 1996
94The Ribble Estuary 1992 surveys : summary of results
95Impact assessment of acidic and metalliferous pollution in the Fowley Stream
96Second annual review of the River Taw catchment management plan
97Second annual review of the River Torridge catchment management plan
98Second annual review of the Taw / Torridge Estuary catchment management plan
99Making an impact on the ground key achievements in 2002 - Somerset area
100An investigation into the bathing water quality at Porthallow