101 | Fishery survey of the Bridgwater and Taunton Canal |
102 | Environmental screening for the Merseyside objective 1 programme : environmental screening guidelines |
103 | Environmental protection and pollution control : in the North West |
104 | The Menai Strait Catchment Managment Plan Action Plan; 1995 (Bilingual) |
105 | Second annual review of the Upper Bristol Avon catchment management plan |
106 | Historic changes in the Upper River Ehen Catchment- Summary |
107 | Second annual review of the Lower Bristol Avon catchment management plan |
108 | Second annual review of the River Torridge catchment management plan |
109 | A second stage evaluation of the Grant YSI3815 Water Logger |
110 | Reduction in aldrin and dieldrin concentrations in the Newlyn River |
111 | Second annual review of the River Taw catchment management plan |
112 | The Tame catchment management plan : consultation report summary : January 1996 |
113 | An investigation to determine the water quality of Churchstanton Stream |
114 | Macroinvertebrates of the River Nar : Great Ouse catchment : draft report |
115 | The River Alt/Crossens fish stock assessment 2001 |
116 | The Mersey Estuary 1992 surveys : summary of results |
117 | Making an impact on the ground key achievements in 2002 - Somerset area |
118 | Lakes, Ponds and Reservoirs in the Southern Region (NRA) |
119 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
120 | Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997 |
121 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
122 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
123 | Decision document on the review of authorisations for British Nuclear Fuels plc to dispose of radioactive wastes from the Springfield nuclear site : main document |
124 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
125 | Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996) |