51 | The Nidd and Wharfe catchment (river factfiles) |
52 | A Laboratory in the River Lab |
53 | Navigations in the Anglian region (EA) |
54 | A brief guide to the medway |
55 | Water resources for the future : a summary of the strategy for Southern region |
56 | The Hydrogeological Classification of Superficial Clay: The Hydrogeological Characterisation of Glacial Till in east Anglia |
57 | Investigation into the 1999 failure of the European Community bathing waters directive at Beer beach (2001) |
58 | Water resources for the future : a summary of the strategy for North East Region |
59 | Water resources for the future : a summary of the strategy for Thames Region Summary |
60 | Investigation of the environmental impact of Coombe Farm on the Clapton Stream January 1992 |
61 | SERPLAN development scenarios : the potential impact upon water resources in the SERPLAN region |
62 | Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR) |
63 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin |
64 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin : April 2000 |
65 | Water resources for the future : a summary of the strategy for Thames Region |
66 | Response to questions posed by Northumbrian Water Authority, with special reference to the fisheries implications of the operation of the Kielder Water Scheme
|
67 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
68 | Darwell Transfer Scheme. Final Report Part II. Location of the draw-off tower in the Darwell Reservoir |
69 | Evaluation of FRONTIERS accumulation forecasts in the NRA Thames and North West regions : final report of the Joint Met |
70 | Report on the quality of bathing waters in Hampshire, Sussex, Kent and the Isle of Wight : 1992 bathing season |
71 | Second interim report on the environmental impacts of the drought on Yorkshire's rivers April 1995 to April 1996 |
72 | A strategy for the management of the new South East Area Biology Team across a dual location following restructuring |
73 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
74 | Appendix to the biodiversity strategy and action plan for the Environment Agency (Thames Region) : costed action plan 2000-2003 |
75 | The Adur and Ouse catchment abstraction management strategy : consultation document |