Skip to main content
#Title
51Investigation into the cause of high pH in the Budleigh Brook
52The extent of phosphorus release in the Norfolk Broads
53The Environment Agency's state of the environment report for Thames Region
54Hysim model : modelling the flows of the River Deben
55The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society
56The release of ammonium and phosphorus from the sediments of the River Ant and Barton Broad : interim report
57The control of phosphorus in the catchment of the rivers Ant and Bure : interim report for period January - December 1992
58A litter assessment of two major tributaries of the Taff, the Cynon and the Rhondda : surveyed March - April 1990
59Investigations into the extent of saline water ingress into the River Parrett and the River Tone : February, March 1994
60Investigation into the probable cause of the 1999 failure of the EC bathing waters directive at Seaton (Devon) beach (70210103) (2000)
61A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024
62Fish found in the tidal Thames
63The River Lark project Model Manual
64River water quality in the Midlands 1997
65Lake restoration : the role of biomanipulation : a one day seminar held in the Broads 18th March 1993 : organised by the National Rivers Authority and the Broads Authority
66Stock assessment review on the River Dart
67Study of the River Stour, Kent
68Investigation to determine if the soakaway from the Stowford Farm caravan site is having an impact on the biological community of the Colam stream
69The River Ogmore action plan support document
70The Tame catchment (NRA Severn-Trent 67)
71Stock assessment review on the River Teign
72Fishery survey of the River Isle catchment
73The river Aire conservation within the catchment : a summary of survey methods and information held on the wildlife of the river Aire catchment
74The River Lark project Final Report
75Fishery survey of the Doniford Stream 1994