26 | The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe |
27 | Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001) |
28 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
29 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
30 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
31 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
32 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
33 | Investigation into the cause of high phenols in Budleigh Brook (1998) |
34 | Non-compliance of the Bidwell Brook with river quality objectives |
35 | An investigation into the sewage system and storm overflow at Beer (1997) |
36 | Second annual review of the Sid/Otter catchment management plan 1999 |
37 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
38 | Non-compliance with water quality objectives on the Croyde stream (upper catchment) |
39 | Impact of breakwaters on the water quality of Sidmouth beach |
40 | An investigation into the incidence of spurting from weeping wall slurry stores |
41 | Impact of reservoir construction construction on the Bruckland Stream |
42 | Public water supplies in the NRA - Wessex Region : initial report 1990 |
43 | Impact assessment of acidic and metalliferous pollution in the Fowley Stream |
44 | Review of fishery regulations on the Rivers Taw and Torridge |
45 | Second annual review of the River Taw catchment management plan |
46 | Second annual review of the River Torridge catchment management plan |
47 | Second annual review of the Taw / Torridge Estuary catchment management plan |
48 | The Hartland Streams catchment management plan : action plan |
49 | Malodours and discolouration on the Wool Brook Sidmouth |
50 | The Seaton, Looe and Fowey catchment management plan : action plan |