1 | Re-building the Anglian coastline |
2 | Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR) |
3 | National marine baseline survey 1995 : littoral cell 3 : the Wash to the Thames |
4 | Factual report on the boreholes and installation of standpipes for the combined investigations in connection with the East Ruston common SSSI Alleviation Scheme |
5 | 'Sea Vigil' water quality monitoring : the Wash 1992-1993 |
6 | Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
|
7 | Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey |