Skip to main content
#Title
26Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon
27Investigation into inputs in the Erme estuary and their effects on the bathing waters at Mothecombe
28Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
29East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
30An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
31Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001)
32An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
33An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
34Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
35Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997)
36A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
37An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
38A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
39The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe
40An assessment of water quality in the River Yarty catchment
41Second annual review of the Seaton, Looe and Fowey catchment management plan
42Investigation into the cause of high phenols in Budleigh Brook (1998)
43The Seaton, Looe and Fowey catchment management plan : action plan
44Environmental planning issues in the North Wessex area
45Impact of breakwaters on the water quality of Sidmouth beach
46The Hartland Streams catchment management plan : action plan
47Non-compliance with water quality objectives on the Croyde stream (upper catchment)
48First annual review of the River Exe catchment management plan
49First annual review of the River Taw catchment management plan (1996)
50Quality audit of biological samples for the 1991 river quality survey