76 | The Menai Strait Catchment Managment Plan Action Plan; 1995 (Bilingual) |
77 | The Swale, Ure and Ouse catchment (river factfiles) |
78 | Second annual review of the Upper Bristol Avon catchment management plan |
79 | Habitat preferences of the bullhead (Cottus gobio) in some Norfolk rivers |
80 | Impact of reservoir construction construction on the Bruckland Stream |
81 | Water resources for the future : a strategy for North East Region |
82 | Second annual review of the Lower Bristol Avon catchment management plan |
83 | Second annual review of the River Torridge catchment management plan |
84 | Review of fishery regulations on the Rivers Taw and Torridge |
85 | Algal blooms in the Lower Tees- Perspectives and prospects
|
86 | Second annual review of the River Taw catchment management plan |
87 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
88 | Eel and elver studies in the Severn : interim report (256/6/ST) |
89 | A report on the River Chew at Chewton Mendip, 6th August 1992 |
90 | Macroinvertebrates of the River Nar : Great Ouse catchment : draft report |
91 | The River Alt/Crossens fish stock assessment 2001 |
92 | The environmental requirements of adult Atlantic salmon (Salmo salar L.) during their upstream migration in the Northwest Miramichi River, New Brunswick. Draft. |
93 | A macroinvertebrate survey of the Releath stream and associated tributaries within the vicinity of Trevethan Farm : final draft report - Water Quality section, Cornwall area |
94 | Datchet, Wraysbury, Staines and Chertsey flood study : aquatic biology. Part 2 : a survey of the wetland vegetation and aquatric macroinvertebrates of the Abbey River and Chertsey Bourne |
95 | Technical review of the post-closure safety case for the Drigg low-level radioactive waste disposal site : PCSC development programme review plan and instructions for reviewers : guidance note 1, December 1997 |
96 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
97 | Decision document on the review of authorisations for British Nuclear Fuels plc to dispose of radioactive wastes from the Springfield nuclear site : main document |
98 | Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996) |
99 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
100 | Review of Literature on the Effect on Aquatic Communities of Particulate Copper in River Systems
|