26 | Links : an overview of the work of the Environment Agency in Devon : autumn/winter 2003 |
27 | An investigation into the water quality of the River Waldon during wet weather |
28 | Investigation into the chemicals present and entering the Stover Lake, Stover Country Park |
29 | Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent |
30 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
31 | The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe |
32 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
33 | Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001) |
34 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
35 | A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89 |
36 | An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley |
37 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
38 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
39 | Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997) |
40 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
41 | An investigation to determine the water quality of Churchstanton Stream |
42 | Quality audit of biological samples for the 1991 river quality survey |
43 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
44 | Second annual review of the Sid/Otter catchment management plan 1999 |
45 | Second annual review of the River Torridge catchment management plan |
46 | Investigations of discharges into the River Lemon at Newton Abbot |
47 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
48 | Impact of breakwaters on the water quality of Sidmouth beach |
49 | Report on the survey of SBM handlers in Devon |
50 | Second annual review of the River Taw catchment management plan |