Skip to main content
#Title
176A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
177An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
178An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
179An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
180Options for development of an enhanced team culture in the NRA, using the Welsh Regional Technical Department as an example
181A preliminary investigation into the extent of saline ingress into Curry Moor from the River Tone, January 1994
182A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
183Procedure for quality assurance for RIVPACS compatible macro-invertebrate samples analysed to the taxonomic level needed for the BMWP-score system
184The Economics of No-Spray Zones - a Study of the Risks and Benefits of Pesticide No-Spray Restrictions
185An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
186An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
187River Habitat Quality the physical character of rivers and streams in the UK and Isle of Man
188An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
189Land use assessment of non-tidal main rivers in the southern region of the National Rivers Authority : report EX 2922
190The Impact Of Particulate Outputs Associated With Timber Harvesting
191Quality audit of biological samples for the 1991 river quality survey
192The Wandle, Beverley Brook, Hogsmill catchment management plan : consultation report : November 1994
193The River Cam catchment management plan : annual monitoring report
194Statement on public consultation for the Dove CMP : July 1995
195The Warwickshire Avon catchment management plan : final plan : October 1994
196Rivers of the Isle of Wight fact file
197Lakes, Ponds and Reservoirs in the Southern Region (NRA)
198Anthropogenic Impacts on the Hydrology of Rivers and Lochs
199National guidelines for the production of NRA regions 1990/91 regional plans
200River Great Ouse navigation : the Great Ouse your river for life