126 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
127 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
128 | Investigation to determine the cause of the long-term BOD failure at Higher Weaver routine monitoring site (70532960) for 1995 and 1997 |
129 | Interim review of drought management experience in the North West Region of the National Rivers Authority. lessons learned (29th June 1995 - March 31st 1996) |
130 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
131 | Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992 |
132 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
133 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
134 | Decision document on the review of authorisations for British Nuclear Fuels plc to dispose of radioactive wastes from the Springfield nuclear site : main document |
135 | National marine baseline survey 1995 : littoral cell 11 : Great Orme to the Solway Firth |
136 | Investigation into the intermittent failure of Wembury Beach to comply with EC bathing water |
137 | Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd |
138 | Report on the By Brook low flow investigations : October 2001 : volume 2 : (figures, maps and appendices) |
139 | Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996 |
140 | Annual classification of river water quality 1992 : numbers of samples exceeding the quality standard |
141 | A report on a baseline survey of the subtidal benthic communities within Portland Harbour (January 1997) |
142 | The environmental economy of England's northwest : a driver for economic and social progress : executive summary |
143 | Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool |
144 | An audit of performance in the processing of macro-invertebrate samples in 1992 |
145 | River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region) |
146 | An assessment of mercury contamination in the Red River catchment : final draft report |
147 | Report on the By Brook low flow investigations : October 2001 : volume 1 : report |
148 | Impact assessment of Meldon quarry on water quality in the West Okement river |
149 | Investigation of tecnazene contamination in the Chyandour Brook west Cornwall during spring 1990 |
150 | Groundwater management in the North West: efficiency review and business plan: certificate in management |